In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.
江苏沙河抽水蓄能电站上水库主、副坝为混凝土面板堆石坝。
The monitoring results of Guanjiachong auxiliary dam are analyzed; and we think that it should be safety monitoring with intersubjective project in-phase for long.
介绍了两种情况下,官家冲副坝的监测成果及分析,认为该坝应该与主体工程同步进行监测。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
应用推荐